The French brewer Brasserie Du Pays Flamand has expanded its malt storage facilities with two new 60m³ GRP silos.
The brewer once again called on Ventilec Industrial BV for this project, having already commissioned several installations from them.
These composite silos were manufactured at the M.I.P. factory in Rijkevorsel (B).
We have fitted both silos with two stunning logos. This was particularly special for us too; we have never before delivered a silo with such a large logo.





