For this project, six double-walled composite storage tanks with a capacity of 150 m³ have been prepared for transport to the customer.
On site, we handle the installation of the tanks, after which they are finished with stairs and platforms.
This project clearly demonstrates how multiple disciplines come together. From initial engineering through production, logistics and assembly, we work step by step towards a reliable and sustainable final solution, in close collaboration with the customer.
Thanks to this strong cooperation, everything comes together smoothly as we move on to the next phase of the project.